Installation Overview

Highlights:

  • Can be installed as a new wall or in front of an old concrete wall
  • Standard installation procedures and equipment — small equipment can be used creating less destruction in an already developed property
  • Provides strength needed for projects without heavy panels, expensive equipment or large crews
  • Lightweight—can be hand-carried to the job site
  • A mandrel is available for difficult soil conditions or for sheets 20 feet or longer
  • Pin pile method provides solution for pinning toe of wall into shallow rock
  • Flat profile makes it easy to form a concrete cap
  • Solutions for various types of wall projects – seawalls, bulkheads, retaining walls, headwalls, cutoff walls, and more

General Steps to Install a Truline Seawall

Below are the general steps to installing a new Truline anchored seawall in loose soil with a concrete cap. These general steps do not replace a professional engineer’s specifications and drawing required per the project parameters.

technical overview step 1 | Truline Vinyl Sheet Piling System

1. Prep site and setup template batter board. Attach male end cap to first u-channel with stainless steel screws. Drive attached parts into ground, aligning vertically and horizontally. Attach it to batter board with screw.

technical overview step 2 | Truline Vinyl Sheet Piling System

2. Continue adding/driving additional u-channel parts, aligning and fastening as you go. On the last u-channel installed, drive female end cap onto the end to finish.

technical overview step 3 | Truline Vinyl Sheet Piling System

3. Flood (jet pipe) u-channels and pump soil plug to designed depth. Install vertical steel rebar in each u-channel cell, as per design.

technical overview step 4 | Truline Vinyl Sheet Piling System

4. Install weep holes, as per design.

technical overview step 5 | Truline Vinyl Sheet Piling System

5. Fill each u-channel cell (tremie pour) with concrete. Form seawall cap, as per design, for the entire length of wall.

technical overview step 6 | Truline Vinyl Sheet Piling System

6. Dig deadman and install tie rod anchors. Pour seawall cap and the deadman with concrete.

Methods of Installation

There are a variety techniques and methods to install the Truline retaining wall system with standard installation equipment. The type of equipment used depends on the type of soil and the length of the Truline sheet piling.

  • Driving – This is the most frequently used method for installing sheet piling with granular soil. In this method the piling is pressed into the soil using vibratory hammers or plates. With hard soil and/or longer sheet piling, a steel guided mandrel can be used.
  • Jetting – Jetting of air or water helps loosen, soften or remove the soil under the sheet piling. Jetting along with driving is very effective.
  • Digging – Often when there are hard soils or rock, a trench can be dug first to set the sheet piling into.
vibratory plate installation | Truline Vinyl Sheet Piling System

Vibratory Plate

jack hammer installation | Truline Vinyl Sheet Piling System

Jack Hammer

vibratory hammer plate installation | Truline Vinyl Sheet Piling System

Vibratory Hammer

vibratory hammer plate installation | Truline Vinyl Sheet Piling System

Vibratory Hammer with Plate

jetting installation | Truline Vinyl Sheet Piling System

Jetting

arizona basin wall installation | Truline Vinyl Sheet Piling System

Multiple Sheets into a Trench

headwall installation | Truline Vinyl Sheet Piling System

Pressure from Bucket

madrel installation | Truline Vinyl Sheet Piling System

Mandrel

digging trench | Truline Vinyl Sheet Piling System

Digging Trench

picking up | Truline Vinyl Sheet Piling System

Picking up Truline U-Channel

Hole in top seawall construction | Truline Vinyl Sheet Piling System

Holes in the top of the U-Channel Parts

custom made driving plates | Truline Vinyl Sheet Piling System

Custom Made Driving Plates

Delivery of Truline Material to Your Jobsite

united states delivery | Truline Vinyl Sheet Piling System
  • Materials are shipped to the jobsite with u-channels bundled in quantities of 10. They can estimate the weight of a bundle by multiplying the length of their parts x 10 x 7# per foot. They need to have equipment capable of handling that weight on the jobsite when the truck arrives.
  • Flatbed trailers are used. The top bundle is 12 feet above ground level.
    The freight broker will call to schedule a delivery appointment with the customer a few days in advance.
  • The driver expects to be unloaded within 2 hours of arriving at the jobsite. Any time over that can be billed in addition to the quote.
  • For accurate freight quote, we need the job site address not the contractor’s business address.
international delivery | Truline Vinyl Sheet Piling System
  • Truline is shipped on 40 ft. containers to ports around the world

Need a Seawall? Have a Question?

Call Today — (239) 591-6234