Case Study: Seawall Replacement — Florida

Seawall Replacement — Florida

Project:
The existing wooden seawall was failing and was going to start affecting nearby foundations if it was not fixed.

Solution:
Truline seawall material was selected for clean aesthetics, ease of installation, and versatility/flexibility for rounded banks. There was not a lot of room for installation between the building’s foundations and the lake, and, with Truline, TSI could use smaller, light equipment.

Equipment:
IHI-80 mini excavator rubber track, IHI-55 mini excavator with rubber track, water jet pump to jet out for install, and vibrating hammer on the IHI-80 to drill it down.

Cost Savings:
The ability to use smaller equipment to install the wall saved fuel, time and preserved a small environmental footprint.

Location: Ft. Myers, FL
Owner: Gulf Harbour Yacht & Country Club Association
Engineer: Hans Wilson & Associates
Contractor: TSI Disaster Recovery LLC
Length of wall: 980 LF (800 series)
Length of sheet piles: 12 ft.

seawall replacement in fort myers florida | Truline Vinyl Sheet Piling System
seawall replacement in fort myers florida | Truline Vinyl Sheet Piling System
seawall replacement in fort myers florida | Truline Vinyl Sheet Piling System