Case Study: Arizona Marina

Marina Resort Seawall — Arizona

Project:
50-year old marina and resort on the riverfront was demolished and a new $14 million resort is being built to include a hotel, pool and spa with a marina, restaurants and more.

Solution:
Truline commercial seawall material was selected to support the upland infrastructure and transition to the floating dock system. In addition, Truline was chosen for its clean aesthetics and long service life. After the seawall was approved by the U.S. Army Corps of Engineers, construction began with the hybrid system, which allowed installers to construct a strong 8” poured-in-place concrete seawall with vinyl protection.

Location: Near Lake Havasu, AZ
Owner: Topock Route 66 Marina Resort
Architect: Pontious Architecture
Contractor: Running Bear Development
Length of wall: 700 LF (800 series)
Length of sheet piles: 14 ft.

marina resort seawall in arizona | Truline Vinyl Sheet Piling System
marina resort seawall in arizona | Truline Vinyl Sheet Piling System
marina resort seawall in arizona | Truline Vinyl Sheet Piling System

Need a Seawall? Have a Question?

Call Today — (239) 591-6234

We use cookies for analytics, advertising and to help improve the content on our website. You can agree to our use of cookies by closing this message and continuing to use our site. Or, to find out more, including how to change your settings, visit our Privacy Policy.